You can speak to the builder early
Homeowners sometimes assume they must commission a complete architectural package before discussing the project with a contractor. In many domestic extensions and refurbishments, it is useful to involve construction and cost expertise earlier.

Start with what the project actually needs
At the beginning, the priority is usually to establish what can be built, what approvals are required, what structural information will be needed and whether the likely cost fits the client’s budget. That does not always require every interior and construction detail to be designed immediately.
Bashtan’s in-house architectural support
Bashtan offers architectural design and planning services as part of its wider design-and-build capability. The recommended cost-conscious route is to produce the essential information needed to progress planning, coordinate structural engineering and allow the construction scope to be priced sensibly.
Avoid paying for detail that may change
Some design decisions are best made after the planning position, structural requirements and budget are clearer. Over-designing too early can mean paying to develop details that are later revised because of cost, buildability or client preference.
High-design support remains an option
A lean first stage does not prevent a client from choosing a more intensive architectural or interior-design service. Clients who want a highly bespoke design can develop that layer once the core project direction is established.
The objective is informed choice
The point is not to minimise design for its own sake. It is to match the level of design work to the decisions that need to be made at each stage, so the client spends the budget where it adds value.
Frequently Asked Questions